The Business Case For BIM in Healthcare Facility Design And Construction 153


The Business Case For BIM in Healthcare Facility Design And ConstruBIMction

Hospitals can be said to be the most complex of common building types. Each hospital is comprised of a wide range of services and functional units. These include diagnostic and treatment functions, hospitality functions and the fundamental inpatient unit. Each of the wide-ranging and constantly evolving functions of a hospital, including highly complicated mechanical, electrical telecommunication systems requires specialized knowledge and expertise, both in design and construction. No one person can have a complete knowledge of the whole, which is why specialized consultants and contractors play an important role in hospital design and construction.

 

This article introduces the reader to Building Information Modeling (BIM), and its ability to enhance savings during design and construction of especially a hospital project. This includes the investor/developer, architect, engineer, contractor, and other stakeholders. A Building Information Model (BIM) is a shared information database, an interactive blueprint with the capacity to shape a facility from the ground up and from the inside out, floor by floor, system by system – in effect a fully detailed 3 Dimensional model of the Hospital constructed on the computer screen. This database is shared between the designers, the project schedulers, the cost control group, the inventory control group, and others as required. The heightened level of collaboration generated by BIM streamlines development, which in turn drives efficiency and results in owners receiving more value out of their facility investment – a key lean construction practice.

When we say “Business Case”, we perceive it as “ability to enhance savings and hence profits”.

Let us look into the design phase. Firstly, BIM assists the designer to create a lean design, without keeping provisions for “virtual quantities”, or using a higher factor of safety. The designer can visualize the structure with clarity and eliminate redundancy. Secondly, since the designer can clearly see the virtual hospital on the computer, he can ‘walk through’ the model and enhance functionality of each department of the hospital, and thus reduce operational costs. Design time is also reduced, cost estimates are streamlined and most importantly, costly rework during construction is eliminated.BIM-Contour

You might ask, how can rework during construction be avoided by design? There is always some rework. Using BIM we can analyze constructability and significantly improve co-ordination with the 3D model. Many clients report this is where the “A-ha” moment occurs. When the design team meets with the sub-contractors in their weekly meeting, it becomes much more productive if you can “ask the model questions” and pose what-if scenarios.

So if you solve 300 clashes at an average value of Rs. 1,00,000/- a piece, you are saving a serious amount of money. And also you will save on rework, re-fabrication and the smooth work of crews, so you save money on the scheduling side of the equation too.

Reduced time for construction means substantial saving in construction costs. With BIM, we can schedule the project construction, and monitor it with more accuracy. To control costs, we can monitor material, manpower and equipment availability periodically, based on the project schedule, and ensure best utilization and minimize wastages. We can reduce idle manpower at site.

Let us take a live project of a hospital constructed using BIM modeling. The challenge was to design and construct a large 400 bed hospital within a time period of 4 years from start. The traditional time frame would be 6 years from date of start of design. Taking statutory approvals was also part of the scope which traditionally takes 6 months. The budgeted cost was also tight at 20% below traditional estimates.BIM3

The project director decided to adopt BIM for all the three phases – design, approval, and construction.

The design of a hospital is relatively complex due to the various facilities which need to be
incorporated, especially the mechanical, electrical and the plumbing works and their co-existence withthe structural elements. The overall design has to be synergistic taking into consideration the interrelationship of various departments. This helps in smooth operations and user-friendly facilities. The design for this hospital was based on a BIM model created after bringing together the design and construction experts, the equipment specialists and experts for fire fighting and other utilities, the users– doctors, nurses and others involved in the project. The chances of any hitches during construction, resulting in re-work, changes in design, and escalation of costs, was thus minimized.

This resulted in a cost effective and technically and architecturally superior design.

Since the 3 Dimensional BIM model – virtual Hospital – was available, statutory approvals were obtained in 3 months, as against a traditional time requirement of about 6 months. The answers to their queries were visually available to them and could be explained easily.

During the construction phase, the work breakdown structure, work scheduling, resource planning for manpower, material and construction equipment, inventory and procurement planning, cash flow, technical inspection checks, etc. were all planned based on the BIM Model. With BIM, it was possible to do off-site prefabrication for various components, thus reducing site works and time. Wastages were also minimized. Rework on MEP was also practically eliminated.

The project was completed within the target completion time and the reduced budgeted cost. This was possible due the early integration of all elements of the design and construction process. On completion, the project director commented – “ Setting up a project this way is incredibly rewarding and it creates a good morale around the project. It was a hard and challenging project, but that’s because the work was hard and challenging, not because a traditional contract encourages you to fight
all the time. This proved to be a much healthier environment for people to work in “.

What, then, is so special about this software based project management and construction? We have already discussed some of the advantages of the 3D model. This 3D model is built by receiving the architects drawing/model in Revit, the structural model in Tekla and the MEP model in ArchiCAD, which are integrated into a single building model using a software platform called Vico.

Beyond 3D modeling we have 4D scheduling and optimal sequencing of tasks and trades. Flowline scheduling is used to enable this optimization process with a model based schedule. It isn’t really rocket science, it’s just common sense, but if forces the optimal sequence and flow of trades through the various locations of the hospital project.
BIM4
A 4D schedule is a visual tool that is created by linking each entity in a 3D model to its corresponding schedule activity to produce a simulation of the construction process over time. This enables visual phasing, sequencing, clash detection between trades and site logistic planning. During construction one of the biggest concerns a healthcare provider has is whether or not the scheduling milestones have been met. 4D scheduling allows for a side-by-side comparison of planned versus actual progress and makes schedule problems easy to identify and resolve.

A flowline schedule lets you visualize the crews by location and by productivity rate.

If you can organize the schedule such that trades can “work through” the entire building without stops and starts, you can imagine the better pricing and quality you’ll get.

BIM also enables 5D estimating, which starts with a robust construction takeoff. With these construction quantities, we can derive a precise estimate and schedule. And with the easy visualization of the model, you can quickly see which elements have been costed already, and which elements still need attention. Also, it allows owners to see which/how various areas of the building are contributing to the total cost of the building.

A 5D cost estimate is a 3D model that is linked to a construction cost estimate through material quantities that are automatically generated from the figures and data built within the model. BIM is thus enabling better budgeting and calculation of cost impacts thus enabling general contractors to help owner clients make better design and value engineering decisions quickly. As an architect, it is very beneficial to be able to tell a client the price difference between a regular 3 foot door and a 4 foot larger lead lined door, or perhaps how much money it will cost them to install upgraded finishes.

And BIM does not stay trapped in the corporate office! As the project moves from design to the site, the BIM moves with it. Just by selecting points within the model and transferring them to the Trimble LM 80 (computer hardware…) they can be laid out on the field with the help of the Total Station. (more computer hardware…) Conversely, construction intersections from the field can be plotted and laid over the BIM model to determine tolerances and check for errors.

So we have given you an overview of BIM and it’s various desirable features. Now why is BIM especially suited for healthcare projects? What makes healthcare different from other architectural design and construction processes? Firstly its complexity, then its volume and also its criticality. In the coming years, India is going to see huge amounts of resources spent on the healthcare sector, which includes the construction of healthcare facilities. How can BIM help healthcare design and construction?

First, during the site survey and renovation phase, laser scanning has been developed to a pointBIM5
where a piece of equipment has the ability to scan millions of points within a space. The information can then be used to accurately draw what the existing space looks like. This highly precise data collection tool has the ability to create a very complete as-built record.

Secondly, during the design phase, we have the benefit of enhanced visualization. During schematic design and design development phases a 3D model can accurately assist a physician in seeing what the facility looks like. For example, a physician will be able to envisage where each piece of equipment is located and if they are better suited in a different location, how large or small the rooms will be, and so on. He/she can also visualize how the general work flow within the clinic will operate once occupied.

Thirdly, we have already read in great detail the advantages of BIM during preconstruction and construction stages. By using integrated design processes and bringing in the various consultants
early on into the design process, there can be substantial cost savings. In this aspect, BIM goes hand in hand with sustainable design.

Finally, post construction the BIM model continues to provide benefits. By using the model correctly during the other phases, a designer has most likely reduced the life cycle cost of the facility, as well as its carbon footprint. In addition the BIM model can help the long term maintenance of the building.

So what are all you healthcare providers out there waiting for? Go for BIM!

Bibliography:

The Business Value of BIM in North America: Multi-year Trend Analysis and User Ratings (2007 – 2012), McGraw Hill Construction.

www.vicosoftware.com website


Leave a Comment

Your email address will not be published. Required fields are marked *

153 thoughts on “The Business Case For BIM in Healthcare Facility Design And Construction

  • Reply
    Health and Fitness
    I am not sure where you're getting your info, but good topic. I needs to spend some time learning more or understanding more. Thanks for excellent info I was looking for this information for my mission.
  • Reply
    dj hire sydney prices
    Good day I am so excited I found your weblog, I really found you by accident, while I was looking on Aol for something else, Regardless I am here now and would just like to say thanks for a remarkable post and a all round exciting blog (I also love the theme/design), I don’t have time to look over it all at the moment but I have saved it and also added in your RSS feeds, so when I have time I will be back to read a great deal more, Please do keep up the great job.
  • Reply
    Health and Fitness
    Wow, fantastic blog structure! How long have you been running a blog for? you make blogging glance easy. The whole look of your web site is magnificent, let alone the content material!
  • Reply
    galapagos cruise specials
    First of all I would like to say terrific blog! I had a quick question that I'd like to ask if you do not mind. I was curious to know how you center yourself and clear your mind before writing. I've had difficulty clearing my mind in getting my thoughts out there. I do take pleasure in writing however it just seems like the first 10 to 15 minutes are generally wasted just trying to figure out how to begin. Any ideas or tips? Cheers!
  • Reply
    kids party dj sydney
    Hello just wanted to give you a brief heads up and let you know a few of the pictures aren't loading properly. I'm not sure why but I think its a linking issue. I've tried it in two different internet browsers and both show the same results.
  • Reply
    healthcare technology consulting firms
    Please let me know if you're looking for a author for your site. You have some really great posts and I believe I would be a good asset. If you ever want to take some of the load off, I'd absolutely love to write some material for your blog in exchange for a link back to mine. Please send me an e-mail if interested. Cheers!
  • Reply
    contact lenses for astigmatism
    When I originally commented I clicked the "Notify me when new comments are added" checkbox and now each time a comment is added I get four e-mails with the same comment. Is there any way you can remove people from that service? Thanks a lot!
  • Reply
    Health and Fitness
    This is really interesting, You are a very skilled blogger. I've joined your rss feed and look forward to seeking more of your great post. Also, I have shared your web site in my social networks!
  • Reply
    Healthy Life Foot Spa
    Wow! This can be one particular of the most beneficial blogs We have ever arrive across on this subject. Basically Great. I am also a specialist in this topic so I can understand your hard work.
  • Reply
    Decoration
    I think this is among the most significant information for me. And i'm glad reading your article. But want to remark on some general things, The web site style is ideal, the articles is really nice : D. Good job, cheers
  • Reply
    new in tech world
    I wanted to send you this tiny note to help give thanks the moment again for your personal breathtaking opinions you have shown at this time. It was quite shockingly generous of you to present publicly exactly what some people could have sold as an electronic book to earn some money for themselves, especially now that you could possibly have tried it in the event you decided. These creative ideas additionally served to provide a good way to fully grasp other individuals have a similar fervor just like mine to realize a great deal more in respect of this problem. I think there are a lot more pleasurable instances up front for many who read carefully your website.
  • Reply
    cheap air fares
    I will immediately grasp your rss feed as I can not find your email subscription hyperlink or e-newsletter service. Do you've any? Please permit me recognise in order that I may just subscribe. Thanks.
  • Reply
    home remodeling designers
    you're in point of fact a excellent webmaster. The website loading speed is amazing. It kind of feels that you are doing any distinctive trick. Furthermore, The contents are masterpiece. you have done a fantastic activity on this subject!
  • Reply
    Modern House Plans
    Excellent goods from you, man. I have understand your stuff previous to and you're just extremely wonderful. I actually like what you have acquired here, certainly like what you are stating and the way in which you say it. You make it entertaining and you still take care of to keep it wise. I can't wait to read far more from you. This is really a terrific web site.
  • Reply
    Technology News
    Hi there, I discovered your web site via Google even as looking for a similar matter, your site came up, it appears great. I have bookmarked it in my google bookmarks.
  • Reply
    Dating
    You have mentioned very interesting points ! ps decent web site . "The length of a film should be directly related to the endurance of the human bladder." by Alfred Hitchcock.
  • Reply
    wood stove fans non electric
    Have you ever thought about adding a little bit more than just your articles? I mean, what you say is fundamental and all. Nevertheless imagine if you added some great photos or video clips to give your posts more, "pop"! Your content is excellent but with images and video clips, this site could undeniably be one of the greatest in its field. Excellent blog!
  • Reply
    pediatric crash cart medications
    Hey I know this is off topic but I was wondering if you knew of any widgets I could add to my blog that automatically tweet my newest twitter updates. I've been looking for a plug-in like this for quite some time and was hoping maybe you would have some experience with something like this. Please let me know if you run into anything. I truly enjoy reading your blog and I look forward to your new updates.
  • Reply
    handheld laser cutter
    Appreciating the time and effort you put into your site and in depth information you offer. It's great to come across a blog every once in a while that isn't the same out of date rehashed material. Fantastic read! I've saved your site and I'm including your RSS feeds to my Google account.
  • Reply
    waterproof
    Hi! I've been following your weblog for a long time now and finally got the courage to go ahead and give you a shout out from Porter Texas! Just wanted to mention keep up the great job!
  • Reply
    heat operated fan
    Hello there! I know this is kind of off topic but I was wondering if you knew where I could find a captcha plugin for my comment form? I'm using the same blog platform as yours and I'm having problems finding one? Thanks a lot!
  • Reply
    wood fireplace fan
    Hey would you mind letting me know which hosting company you're working with? I've loaded your blog in 3 completely different web browsers and I must say this blog loads a lot faster then most. Can you recommend a good hosting provider at a fair price? Cheers, I appreciate it!
  • Reply
    eco fan for fireplace
    I'm curious to find out what blog platform you happen to be using? I'm having some small security problems with my latest blog and I'd like to find something more secure. Do you have any solutions?
  • Reply
    wood burning fireplace blower
    It's a pity you don't have a donate button! I'd definitely donate to this outstanding blog! I guess for now i'll settle for bookmarking and adding your RSS feed to my Google account. I look forward to brand new updates and will share this site with my Facebook group. Talk soon!
  • Reply
    kitchen hood
    Hello! I know this is kinda off topic but I was wondering which blog platform are you using for this website? I'm getting fed up of Wordpress because I've had problems with hackers and I'm looking at options for another platform. I would be fantastic if you could point me in the direction of a good platform.
  • Reply
    wet basement solutions
    Hello there! I could have sworn I've been to this site before but after browsing through some of the post I realized it's new to me. Anyhow, I'm definitely delighted I found it and I'll be book-marking and checking back frequently!
  • Reply
    wet basement repair cost
    Hey this is kind of of off topic but I was wanting to know if blogs use WYSIWYG editors or if you have to manually code with HTML. I'm starting a blog soon but have no coding know-how so I wanted to get guidance from someone with experience. Any help would be enormously appreciated!
  • Reply
    small laser etching machine
    Write more, thats all I have to say. Literally, it seems as though you relied on the video to make your point. You clearly know what youre talking about, why throw away your intelligence on just posting videos to your blog when you could be giving us something informative to read?
  • Reply
    fairy party props
    I was curious if you ever thought of changing the layout of your blog? Its very well written; I love what youve got to say. But maybe you could a little more in the way of content so people could connect with it better. Youve got an awful lot of text for only having 1 or two images. Maybe you could space it out better?
  • Reply
    it crash cart
    This design is steller! You definitely know how to keep a reader entertained. Between your wit and your videos, I was almost moved to start my own blog (well, almost...HaHa!) Wonderful job. I really loved what you had to say, and more than that, how you presented it. Too cool!
  • Reply
    fairy garden party
    Hey there! Quick question that's completely off topic. Do you know how to make your site mobile friendly? My blog looks weird when viewing from my apple iphone. I'm trying to find a template or plugin that might be able to resolve this issue. If you have any suggestions, please share. Thank you!
  • Reply
    Teen Room Designs
    Hi, Neat post. There's an issue with your website in internet explorer, would test this¡K IE nonetheless is the market chief and a big component to other people will leave out your fantastic writing because of this problem.
  • Reply
    Kitchen Designs
    Heya i’m for the first time here. I came across this board and I find It truly useful & it helped me out a lot. I hope to give something back and aid others like you helped me.